Bulldozer spare part blade, SD13/SD16 blade

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-08-21 06:17

  • Browse the number:

    31

Send an inquiries
+
Jining Qianyu Commercial & Trade Co., Ltd.
Contactaixin:

Contactaixin:

weigems(Ms.)  

telephone:

Area:

Beijing

Address:

Xiangtai Plaza Building 4, 805, Yingxiong Shan road 129, Jinan, Shandong, China (272000)

Website:

http://weigems.homemassageseries.com/

+
Model Number: SD13/SD16 Brand Name: various brands and models Key Specifications/Special Features: Description: Bulldozer spare part blade SD13/SD16 blade1. New2. Good service3. Fast delivery (within 3 days after confirming the payment)4. Shipment by air, ship and express5. Payment terms: by T/T, Western Union and PayPal
Company information:
We are Jining union machinery and part company limited, we can supply excavator hydraulic pumps, final drives, hydraulic cylinder seal kits, arm boom bucket, seal kits, O-ring kits, engine liner kits, cylinder heads, cylinder blocks, crankshafts, camshafts, connecting rods, con rod bearings, valves, gasket kits, excavator and dozer track link assy, idlers, sprockets, track rollers, carrier rollers, buckets, tooth, bolts, nuts, engine, engine related parts, cooling system, fuel tank and related parts, electrical system, hydraulic system, main/revolving frame and related parts, operator's compartment and control system, guard, swing circle and related parts, travel and lower piping, under carriage, work equipment, marks and plates, accessory, miscellaneous, service and component parts

Company can supply genuine spare parts:
1)Under carriage spare parts: track shoe, track link, bolt, track roller, carrier roller, sprocket, front idler and idler cushion
2)Engine spare parts: engine ass'y, cylinder head, cylinder block, turbocharger, piston, piston ring, metal, crankshaft, oil pump, fuel injection pump, water pump, alternator and starting motor
3)Hydraulic spare parts: main valve, main pump, solenoid valve, boom/arm/bucket cylinder, final drive, travel motor, swing machinery and swing motor
4)Operator's cab spare parts: cab ass'y, monitor, controller, engine controller, wiring harness, seat, air conditioner and air compressor
5 )Cooling parts: radiator, heat sink, air conditioner, compressor, after cooler , water coolerhydraulic oil cooler
6 )Other parts: service kit, swing circle, engine hood, swivel joint, fuel tank, filter, boom, arm and bucket

About shipping ways:
Delivery lead-time depends on the destination and other factors, may be up to7 working days
In order to ensure you receive you order tax free upon import, we will declare it as a “sample” with lower value
After we ship goods, we will Email you shipping information, as well as tracking number
Shipping Information:
  • FOB Port: Guangzhou/Shenzhen/Shanghai
  • Lead Time: 3 - 5 days
Main Export Markets:
  • Asia
  • Australasia
  • Eastern Europe
  • Mid East/Africa
  • Western Europe